Government · Meeting preview

Paducah weighs $70,294 in riverfront contract increases

A separate proposal would give Viking priority docking at the downtown pier for five years.

ProPaducah story card: Riverfront costs. $70,294 in changes proposed.
ProPaducah story card. No photograph accompanies this story.

Paducah commissioners will consider adding $70,294.25 to two riverfront improvement contracts Tuesday, Nov. 24, for electrical work and additional inspection and testing.

The proposed contract changes include $44,474.25 for Jim Smith Contracting and $25,820 for engineering firm HDR Inc. Approval would authorize the mayor to sign the changes.

The construction work covers dock event power, an inground junction box, seven event power panels and waterproofing electrical junctions. The city says the additional testing and inspection costs reflect a longer construction phase and the number of concrete pours.

The city celebrated completion of the riverfront improvements Sept. 18, nearly two years after construction began in November 2024. The project added a 500-foot excursion pier and plaza, a new entrance to downtown and a pathway near the Quilt Murals.

It also added a park with a compass rose near the transient dock, bus shelters and crosswalks. Funding included a $10.4 million federal BUILD grant administered by the U.S. Maritime Administration and $3.5 million from the state.

Viking docking proposal

Commissioners will also consider authorizing the mayor to sign a five-year agreement giving Viking USA LLC priority docking at the riverfront pier. It includes three five-year renewal options.

Both contract changes and the docking proposal are on the consent agenda, which groups items into one vote unless a commissioner requests separate consideration.

The commission meeting begins at 5 p.m. Tuesday at City Hall, 300 S. Fifth St. The public can attend or watch through the city’s YouTube and Facebook pages or Government 11.

Sources and updates

Based on the revised Nov. 24 agenda and action forms, the city’s Sept. 22 project summary and its meeting information. These proposals had not been voted on at publication.

Prepared with AI assistance and checked against the linked city records. How we use AI · Report a correction

Share the evidence

Share this chart

Download full chart (PNG)

Your comment stays in this browser tab. Copy it below, then paste it into Facebook’s composer.

Continue to Facebook →

The link opens this chart with its year, definitions and source. You choose what to post in Facebook.

Privacy settings

Essential storage remembers this choice and supports the site. It is always available.

This choice does not sign you up for a newsletter or give permission for marketing email. More about privacy